Preliminary Plat - $1,000 base fee plus $250 per lot over 2 lots. Includes up to 2 reviews. Additional plat reviews shall be $250 per review. Over 4 lots require preliminary review and final review.
Final Plat - $1,000 base fee plus $250 per lot over 2 lots. Includes up to 2 reviews. Additional plat reviews shall be $250 per review. Less than 4 lots do not require preliminary review.
Recording construction plan for Subdivisions - $500
New subdivision sign or subdivision sign modification fee - $500
Other new signs or sign modification fee - $250
Presentation Fee to Board of Zoning Appeals/Planning Commission
Variance/Administrative Appeal - $250
Conditional Use Permit without addition of impervious surface, non-variance - $1,000
Conditional Use Permit with addition of impervious surface, non-variance - $4,000
Other Fees
Residential Plan Review Fees - $150 per hour
C.U.P. Holders Plan Review Fees - $100 per hour
Steep Slope Review Fee - $1,000, includes up to 2 reviews. Additional reviews are $500 each.
Radnor Lake Overlay Fee - $1,000, includes up to 2 reviews. Additional reviews are $500 each.
If the review is both a steep slope and Radnor Lake impact review, the fee is $2,000. Includes up to 2 reviews. Additional reviews are $500 each.
General Permits
Price of Job
Permit Fee
Number of Inspections
$1-$1,000
$100
1
$1,001-$5,000
$200
Up to 2
$5,001-$10,000
$300
Up to 3
$10,001-$15,000
$400
Up to 4
$15,001-$25,000
$500
Up to 5
$25,001-$35,000
$600
Up to 5
$135,001-$50,000
$800
Up to 5
$50,001-$75,000
$1,250
Up to 5
$75,001-$100,000
$1,500
Up to 10
$100,001-$150,000
$2,000
Up to 11
$150,001-$250,000
$2,500
Up to 13
$250,001-$500,000
$4,000
Up to 15
$500,001-$750,000
$5,000
Up to 17
$751,001-$1,000,000
$6,000
Up to 19
$1,000,001-$1,500,000
$10,000
Up to 20
$1,500,001-$2,000,000
$15,000
Up to 23
$2,000,001-$2,500,000
$20,000
Up to 25
$2,500,001-$3,000,000
$30,000
Up to 27
$3,000,001-$4,000,000
$40,000
Up to 30
$4,000,001-$5,000,000
$50,000
Up to 38
$5,000,001-$7,000,000
$60,000
Up to 40
$7,000,001-$10,000,000
$100,000
Up to 48
$10,000,001-$15,000,000
$150,000
Up to 50
$15,000,001-$20,000,000
$200,000
Up to 73
$20,000,001
$250,000
Up to 75
Notes
If construction is started before a permit is obtained, the Permit Fee will be doubled.
Job Costing includes demolition costs, driveways, pools, etc.
Inspections in excess of the respective number of inspections listed below will be charged at a rate of $125.00 per inspection, and payment to the City shall be made in full by the applicant prior to the issuance of the Use and Occupancy permit by the City.