Building Fee Permit Schedule APPROVED AUGUST 2005
| I. Fees for Residential Jobs Costing: |
| A. |
$1 to $1,000 |
$50 |
1 inspection |
| B. |
$1,001 to $5,000 |
$100 |
2 to 3 inspections |
| C. |
$5,001 to $10,000 |
$250 |
3 to 4 inspections |
| D. |
$10,001 to $15,000 |
$300 |
4 to 5 inspections |
| E. |
$15,001 to $25,000 |
$450 |
5 inspections |
| F. |
$25,001 to $35,000 |
$550 |
6 inspections |
| G. |
$35,001 to $50,000 |
$750 |
7 inspections |
| H. |
$50,001 to $75,000 |
$1,000 |
8 inspections |
| I. |
$75,001 to $100,000 |
$1,200 |
10 inspections |
| J. |
$100,001 to $150,000 |
$1,500 |
11 inspections |
| K. |
$150,001 to $200,000 |
$1,750 |
13 inspections |
| L. |
$200,001 to $500,000 |
$2,000 |
15 inspections |
| M. |
$500,001 to $750,000 |
$2,500 |
18 inspections |
| N. |
$750,001 to $1,000,000 |
$3,000 |
20 inspections |
| O. |
$1,000,001 to $1,500,000 |
$5,000 |
20+ inspections |
| P. |
$1,000,001 to $2,000,000 |
$7,500 |
25 inspections |
| Q. |
$2,000,001 to $2,500,000 |
$10,000 |
25+ inspections |
| R. |
$2,500,001 to $3,000,000 |
$12,500 |
30 inspections |
| S. |
$3,000,001 to $4,000,000 |
$17,500 |
30+ inspections |
| T. |
$4,000,001 to $5,000,000 |
$22,500 |
40 inspections |
| U. |
$5,000,001 to $7,000,000 |
$30,000 |
40+ inspections |
| V. |
$7,000,001 to $10,000,000 |
$50,000 |
50 inspections |
| W. |
$10,000,001 to $15,000,000 |
$75,000 |
50+ inspections |
| X. |
$15,000,001 to $20,000,000 |
$100,000 |
75+ inspections |
- Residential Variance Submission/Review/Appeal: $100
- Church/ School
- Conditional Use Permit Submission/Review without addition of impervious surface: $500.00.
- Conditional Use Permit Submission/Review with addition of impervious surface: $3,000.00 for reviewing both BZA and PC.
Note: The fees stated above shall be doubled in the event an applicant takes any action on their property that would require any of the above-stated applications and submissions without first obtaining the approval required by ordinances and regulations of the City of Oak Hill and without first paying the appropriate fee to the City.
- Subdivision Fees
- Subdivision Preliminary Plat: $1,000.00 base fee plus $250 per lot for each lot over two (2). This includes two reviews by staff/ engineer/attorney. Any additional plat review required shall be $250.00 for each review.
- Subdivision Final Plat: $1,000.00 Base Fee plus $250 for each lot over two (2). This includes two reviews by staff/engineer/attorney. Any additional plat review shall be $250.00 for each review.
- Construction Plan Review: $500.00
- Steep Slope Review Fee: $800.00 if not in the Radnor Overlay. The fee shall be $1,000.00 for both the Steep Slope Review and the Radnor Overlay Review if both are applicable to the lot in question.
- Radnor Overlay Review Fee: $600.00 if not in a Steep Slope. The fee shall be $1,000.00 for both the Steep Slope Review and the Radnor Overlay Review if both are applicable to the lot in question.
Note: The fees stated above shall be doubled in the event an applicant takes any action on their property that would require any of the above-stated applications and submissions without first obtaining the approval required by ordinances and regulations of the City of Oak Hill and without first paying the appropriate fee to the City.
- Other Items
- Plan review fees, residential: Small construction: $50 Large construction: $100
- Plan review fees, commercial (schools or churches): $50 per hour
- Telecommunications tower fee: Based on value of project (per 1997 SBCCI)
- Fine for not obtaining a permit: Double the permit fee for the project
Call the City office at 371-8291 to request inspections.
©