Permit Fees

Filing Subdivision Plat

  • Preliminary Plat - $1,000 base fee plus $250 per lot over 2 lots. Includes up to 2 reviews. Additional plat reviews shall be $250 per review. Over 4 lots require preliminary review and final review.
  • Final Plat - $1,000 base fee plus $250 per lot over 2 lots. Includes up to 2 reviews. Additional plat reviews shall be $250 per review. Less than 4 lots do not require preliminary review.
  • Recording construction plan for Subdivisions - $500
  • New subdivision sign or subdivision sign modification fee - $500
  • Other new signs or sign modification fee - $250

Presentation Fee to Board of Zoning Appeals/Planning Commission

  • Variance/Administrative Appeal - $250
  • Conditional Use Permit without addition of impervious surface, non-variance - $1,000
  • Conditional Use Permit with addition of impervious surface, non-variance - $4,000         

Other Fees

  • Residential Plan Review Fees - $150 per hour
  • C.U.P. Holders Plan Review Fees - $100 per hour
  • Steep Slope Review Fee - $1,000, includes up to 2 reviews. Additional reviews are $500 each.
  • Radnor Lake Overlay Fee - $1,000, includes up to 2 reviews. Additional reviews are $500 each.
  • If the review is both a steep slope and Radnor Lake impact review, the fee is $2,000. Includes up to 2 reviews. Additional reviews are $500 each.
  • General Permits


     Price of Job
    Permit Fee
    Number of Inspections
    $1-$1,000 $100 1
    $1,001-$5,000 $200 Up to 2
    $5,001-$10,000  $300
    Up to 3
    $10,001-$15,000  $400 Up to 4
    $15,001-$25,000  $500 Up to 5
    $25,001-$35,000  $600 Up to 5
    $135,001-$50,000  $800 Up to 5
    $50,001-$75,000  $1,250 Up to 5
    $75,001-$100,000  $1,500 Up to 10
    $100,001-$150,000  $2,000 Up to 11
    $150,001-$250,000  $2,500 Up to 13
    $250,001-$500,000  $4,000 Up to 15
    $500,001-$750,000  $5,000 Up to 17
    $751,001-$1,000,000  $6,000 Up to 19
    $1,000,001-$1,500,000  $10,000 Up to 20
    $1,500,001-$2,000,000  $15,000 Up to 23
    $2,000,001-$2,500,000  $20,000 Up to 25
    $2,500,001-$3,000,000  $30,000 Up to 27
    $3,000,001-$4,000,000  $40,000 Up to 30
    $4,000,001-$5,000,000  $50,000 Up to 38
    $5,000,001-$7,000,000  $60,000 Up to 40
    $7,000,001-$10,000,000  $100,000 Up to 48
    $10,000,001-$15,000,000  $150,000 Up to 50
    $15,000,001-$20,000,000  $200,000 Up to 73
    $20,000,001 $250,000 Up to 75

    Notes


    • If construction is started before a permit is obtained, the Permit Fee will be doubled.
    • Job Costing includes demolition costs, driveways, pools, etc.
    • Inspections in excess of the respective number of inspections listed below will be charged at a rate of $125.00 per inspection, and payment to the City shall be made in full by the applicant prior to the issuance of the Use and Occupancy permit by the City.